rsallenus Chirpy
Registered: 15/07/09
Posts: 1
|
|
|
Reply with quote | #1 |
I am trying to change the format of a date in a merged field. I have tried adding \@ "dd/MMM/yy" after the date field in my master document, but when I save and reopen the document, the formatting switch is not visible and the date format in my child document is a different format.
I am using Word 2000 v9.0 and merging from an Access 2000 mdb. |
| |